Commercial Concrete Floor
New concrete floor put down in place of damaged floor, strengthening of building to insurable state
New concrete floor put down in place of damaged floor, strengthening of building to insurable state
Natural Stone Shower Area
Existing floor rotten due to leak in previous shower. Replaced with new treated flooring and tiled to clients tile choice
Existing floor rotten due to leak in previous shower. Replaced with new treated flooring and tiled to clients tile choice
Custom Built Seat
Seat built to allow client to sit, relax and unwind under a hot shower on those cold days and nights
Seat built to allow client to sit, relax and unwind under a hot shower on those cold days and nights
Creaking Second Floor Boards
Removed existing flooring due to creaking, insulated with batts to minimise noise on ground floor. Also adding insulation to ceiling for ground floor
Removed existing flooring due to creaking, insulated with batts to minimise noise on ground floor. Also adding insulation to ceiling for ground floor
Leaking Shower Enclosure
Removing tiled shower to identify leak which was appearing in 2nd floor ceiling. Replaced ceiling and damaged floor
Removing tiled shower to identify leak which was appearing in 2nd floor ceiling. Replaced ceiling and damaged floor
Shower Floor Rot
Removed an old shower to find damaged flooring. Re framed the new floor to install a new shower into an older apartment unit
Removed an old shower to find damaged flooring. Re framed the new floor to install a new shower into an older apartment unit